5. Site Plan Approval: This, the first of the municipal approvals,
along with a Committee of Adjustment approval for minor variances,
may or may not be required depending on the nature of the proposal
and the by-laws of the local municipality. BB&R Architect
Inc. works with local authorities to enable a smooth process and
timely response to any concern. In Site Plan Approval, all the
external aspects of the building are detailed and approved, including
parking, site access and fire routes, landscaping, site drainage
and site services (i.e. water, sewers, gas, hydro, etc.). Copies
of the proposed site plan are circulated to all municipal departments,
services and utilities for comment, revision and approval. As
well, the local planning staff may review the proposed building
elevations and finish materials. The granting of a minor variance
may be necessary to suit a reasonable alternative to the requirements
of the local Zoning By-law. BB&R Architect Inc. often represents
the client before the Committee of Adjustment and is often present
if a community meeting is required to assuage neighbourhood concern.
If Site Plan Approval or a minor variance is required, the process
can add months to a proposed project time frame. The work of a
registered Ontario Landscape Architect may be required for Site
Plan Approval. Usually the work of this consultant is outside
the scope of our fee agreement as is the time spend by BB&R
Architect Inc. to apply for and secure approvals.
6.
Construction Documents: These are the detailed drawings and specifications
that are the basis of the building permit application, tendering
and construction. They set forth the architectural, structural,
mechanical and electrical requirements for the project including
materials and finishes. BB&R Architect Inc. and our consultants
understand the importance of producing construction documentation
that clearly illuminates the design with the appropriate extent
of technical detailing. In a project for which the construction
will be carried out in phases, construction documents are produced
for the completed project to ensure all matters are co-ordinated
and only one application for building permit is required. Construction
and project budgets are again reviewed at this stage and confirmed
if acceptably different. It is usual at this stage that for a
congregation its denominational authority requires assurance of
adequate funding for the construction project to proceed to the
next stage.
7.
Permit Application: The building permit application usually requires
longer than the tendering/ contract approval stage, and can be
made on the basis of less complete documentation. If prior municipal
approvals are in hand and there is little uncertainty in the construction
estimate, then we usually recommend applying for the building
permit as soon as the construction documents are sufficiently
complete. BB&R Architect Inc. usually acts as the agent for
the Owner in making the application, although the Owner pays the
cost of the permit.
8.
Tendering/ Contract Approval: Usually, BB&R Architect Inc.
obtains competitive bids from General Contractors on behalf of
the Owner for the construction of the project based on the construction
documents. Up to this point, we have assessed the construction
cost either on the basis of experience or by relying on a cost
consultant. Either method is but an estimate. The accepted tender
price is the real cost of the work. The tender also includes a
time frame to carry out the construction work. If the tender price
follows the most recently confirmed estimate, then proceeding
to a construction contract can occur smoothly. If the tender price
greatly exceeds the most recent estimate, then negotiations are
required with the low bidder, or the project can be modified and
re-tendered. BB&R Architect Inc. works to avoid such negotiations,
particularly where the scope of work might change, by constantly
being aware of potential cost implications of changes throughout
the project to date and addressing matters as they arise. In the
past, we have had success in working with construction managers.
For some clients this method of project delivery can be beneficial.
9.
Construction: During this stage, BB&R Architect Inc. acts
as the Owner's representative and periodically reviews the work
for conformity to the construction documents, issues clarifications
as required and prepares change directives as requested by the
Owner or to suit 'unknowables' in site conditions. BB&R Architect
Inc. certifies payment to the General Contractor and prepares
change orders to amend the original contract if required. BB&R
Architect Inc. continues to meet with the Building Committee to
keep the client informed of progress and to seek approval for
matters such as colour choices and contract changes. As throughout
the entire project, BB&R Architect Inc. strives to develop
a co-operative relationship between all parties in order to bring
each project to a successful conclusion.
10.
Warranty Period: For most matters BB&R Architect Inc. acts
as intermediary, keeping abreast of problems that arise after
construction is complete and informing the General Contractor
of remedial work to be done. If need be, near the end of the 1-
year warranty period, we organize a meeting on site to review
outstanding deficiencies arising throughout that period and noting
any new concerns.